Keen Pump joins Kinetiflo Group. Read the Press Release →

Product Description

ANSI Centrifugal Process Pumps

In 1977, the American National Standard Institute (ANSI) established criteria for centrifugal pumps in terms of dimensions, chemical composition of the materials and safety specifications, to cover the needs from the chemical process industry. Design features were established, such as being self-venting, foot mounted, center line discharge and back pull-out disassembly. The ANSI pump revolves around a basic hydraulic and mechanical design concept to ensure greater efficiency in the range of operation, flexible application and superior interchangeability.

HIGH HEAD PERFORMANCE

  • Pressure Head up to 670ft.
  • Temperatures up to 350*F (177*C)
  • Pressures up to 285 PSI.
  • Capacities up to 4000 GPM

AVAILABLE MATERIALS

  • Ductile Iron
  • 316 Stainless Steel
  • CD4MCu

VERSATILE CONSTRUCTION OPTIONS

  • More than 30 different models

VALUE

  • Immediately Available for Quick Shipment 
  • Priced to Save You Money 

SERVING INDUSTRIES

  • Automotive 
  • Food & Beverage
  • Textile
  • Pharmaceutical
  • Chemical 
  • Pulp & Paper 
  • General Industry 

Additional Details

Other Keen Products

© 2026 Keen Pump. All rights reserved.

Get Product Info

Please Send Me